| |
COST EFFECTIVE SOLUTION October 1st 2004 An environmentally friendly and cost effective way of washing small tools and mobile construction plant on-site has been developed jointly by Blue Diamond and Travis Perkins.
The Bio-Zyme wash-down station disposes with the need for an in-ground inceptor, which is brought above ground level and replaced by a shallow tray covered with a load- bearing platform.
Oil and muck cleaned from machinery by a water jet drains through the platform into the trays sump which has integrated filtration unit. This captures particle matter and retains oil and hydraulic fluid contamination. More articles from Blue Diamond: |